Taipei, Monday, Nov 25, 2024, 01:23

News

Delta Americas Opens New HQ to meet LEED Platinum and Net Zero

Published: Oct 23,2015

Delta today announces the opening of its new Americas headquarters in the City of Fremont that is designed to meet LEED Platinum and net zero standards. This new 180,000 square foot facility stands as a testament to Delta’s commitment to the Americas market.

More on This

Delta to Showcase New Vivitek 4K Projector and FHD Ultra Short-Throw Laser Projector at CES

Delta today announced it will unveil new products at CES 2017, including Vivitek’s HK2288, a 4K Ultra HD DLP projector...

Delta Intelligent Building Solutions Debut at Japan Build 2016

From December 14th to 16th, Delta Electronics will present its intelligent building solutions at Japan Build 2016, and v...

It incorporates many of Delta’s own green technologies to achieve an elite level of sustainability. Through Delta’s Solar Photovoltaic (PV) power system, over 1,000 MWh of electricity is expected to be generated per year.

Additionally, the new Delta Americas Headquarters boasts a geothermal heating and cooling system that reduces HVAC (Heating, Ventilation and Air Conditioning) energy consumption by 60 percent compared to traditional systems.

“Since 2005, all of Delta’s new buildings around the world have been built to sustainable standards. In the past 10 years, we have commissioned the construction and renovation of 21 green buildings and will share our experiences with international audience in December, at this year’s Conference of Parties, more commonly referenced to as the COP21,” said Bruce Cheng, Delta's Founder and Honorary Chairman.

“This aligns with the company’s mission to provide innovative, clean, and energy-efficient solutions for a better tomorrow.”

“Every new Delta building is a green building. We maintain an internal directive to only abide by the latest green standards, and with the new Fremont headquarters, our goal is to be net zero,” said M.S. Huang, President Delta Americas. “We’ve incorporated our most innovative products to ensure that the Delta Americas Headquarters becomes a model of green building and also a showcase for Delta’s solutions.”

The geothermal heating and cooling system significantly reduces the building’s energy requirements, allowing it to rely on renewable energy produced onsite. To meet net zero criteria, the building is powered by a 616kW solar system utilizing Delta’s own solar inverters that have an energy conversion efficiency of up to 98.5 percent and is expected to generate over 1,000 MWh of electricity per year. The building, designed by J.J. Pan & Associates and constructed by Vance Brown general contractors, and every inch is built to exceed energy and environmental standards.

The facility’s geothermal heating and cooling system uses a ground source heat pump connected to a loop field of pipes located up to 30 feet underground. The pipes cover an area greater than 5 football playing fields. Heat is transferred to or from the ground to boost efficiency and achieve the 60 percent reduction in energy consumption compared to traditional HVAC systems.

The ground source heat pump loops into the building’s bi-directional radiant floor and ceiling tubes embedded in the concrete slabs. In total, there is more than 92 miles of pipe circulating 12,000 gallons of water.

In addition to optimizing energy usage, the facility also features a 140,000 gallon rain water harvesting system for irrigation, while the uncollected rainwater will be directed to a bioswale. Moreover, 20 percent of the building materials are reclaimed.

CTIMES loves to interact with the global technology related companies and individuals, you can deliver your products information or share industrial intelligence. Please email us to en@ctimes.com.tw

1512 viewed

comments powered by Disqus